Focused stakeholder consultation on revised draft PIC/S guidance on Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments
A revised Draft PIC/S Guidance on Good Practices for Data Management and Integrity in Regulated GMP/GDP Environments (PI 041-1 (Draft 3)) has been prepared by the PIC/S Working Group on Data Integrity, co-led by Australia / TGA and UK / MHRA.
The purpose of the guidance is to serve to outline the position an inspector would adopt during the inspection of GDP/GMP facilities and is designed to facilitate a harmonized approach to the inspection, including reporting with regard to data management and integrity. A first draft (PI 041-1 (Draft 2)) was published by PIC/S on a trial basis in August 2016.
Following feedback received from PIC/S Participating Authorities during its 6-month implementation trial-period, the draft of this guidance has been updated and expanded by the Working Group.
PDA is happy to assist with a focused stakeholder consultation on this document seeking substantive comments on specific questions relating to the proportionality, clarity and implementation of the guidance requirements.
The consultation period will last 3 months and run from 30 November 2018 to 28 February 2019.
Submit Feedback
To submit feedback, please provide feedback exclusively on the dedicated template.
Download Template
Consultation Document
Download the PI 041-1 (Draft 3) consultation document.
Download